3. Right after rig positioning, travel the casing into the ground. Travel metal casing to some minimum a depth of 1 m down below the ground stage to just take lateral loads and actions at website. The metal casing also combat complications because of groundwater during piling. আমাদের কোম্পানিতে দক্ষ https://cast-in-situ-piles59371.blog4youth.com/33180283/cast-in-situ-piles-secrets